“Dennis and crew remodeled a lower level (basement) bathroom after we had the shower replaced with a slightly larger one. They reconfigured one wall adding space, installed new suspended ceilings there and in the lower level bedroom which required replacing ceiling light fixtures and they coordinated with the electrician to do both on the same day. They removed the bathroom wallpaper and painted. It is so fresh and bright now. Carpeted stairs from the front entry to lower level were replaced with a vinyl plank flooring with Dennis working closely to match a custom wood on the stair banisters. My husband’s illness necessitated close coordination of our schedules and the crew was very accommodating. I highly recommend PFD Remodeling.”
